Manage Your Engine Fleet Lifecycle Effectively on a Single Platform

Engine

QOCO Engine Management Platform

Real-time engine data and status drill downs from fleet level to single modules and parts
 
Dashboards on asset status, location, movement and vendor tracking
 
Forecasts up to 3 years ahead for engine removals (LLP, EGT margin triggers), spare engine availability, and LLP, spare part and key materials needs
 
Comprehensive planner for engine removal and shop visit planning
 
Additional modules include scenario and financial planning
 
MROs can be integrated for automated data and document exchange improving shop visit and work scope planning, transparency, and cost and timeline predictability
Asset Data

Full Asset Data

Aggregation and visualisation of all engine data from various data sources
 
Relational Single Source of Truth with drill downs
 
Covering all levels — fleet, aircraft, engine, modules and single parts
Engine location

Dashboards

Powerful dashboards depicting engine status, location, movements et cetera
Line of balance

Powerful Forecasts

Accurate forecasts for engine health, engine removal windows (hard and soft limits, recommendations), spare engine availability and part requirements
Engine removal planner shadow

Comprehensive Planner

A flexible and intuitive Planner where engine fleet managers can plan removals, shop visits, spare engine logistics, parts provisioning et cetera across aircraft and engine fleet and MROs

Our Other Best-in-Class Software Solutions for Enhanced Efficiency in Tech Ops and Digital Aftermarket

Solution icon resized

All QOCO solutions are solely designed to drive operational efficiency in aviation maintenance. They are flexibly integrated to existing enterprise systems, M&E systems and other IT systems, and come with consumer-grade user interfaces ensuring a short learning curve and strong adoption.

Book a discovery call with one of our experts

qoco plane image

Let's explore your challenges and improvement ambitions together.

After a short call you will have a better understanding of potential bottlenecks, areas of improvement and possible solutions to drive significant improvements in your Tech Ops processes and Digital Aftermarket services.

Book your call today!