Build, Buy or Extend: Three Paths to Higher Maintenance Labour Productivity with Digital Solutions

Written by Lari Laukia | Nov 25, 2026, 12:30:55 PM

Airlines seek maintenance labour efficiency improvements, and one of the biggest levers is better planning: issuing the right work to the right qualified people at the right time. But that’s easier said than done. Workloads are unevenly spread, real-time data is hard to see, and resource availability and maintenance schedules often don’t match. At the same time, fleets are growing and the pressure on on-time performance and resource utilisation keeps rising.

Spreadsheets and manual processes can't keep up, and inaction is no longer an option. Airlines need digital and AI solutions that streamline and optimise the end-to-end process from planning to production delivering an outsized impact on operational efficiency.

Initially, several paths to building the capability can appear viable, and choosing the right approach requires a meticulous assessment. Depending on company situation, options may include 1) opting for the best readily available software on the market, 2) building an in-house solution from scratch or 3) leveraging existing systems (e.g., M&E system) by programming them to cater to the needs of the operation.

Evaluation frameworks differ. Key considerations can however be often reduced to the following:

Right to Build & Own: Most fundamentally, the first question to ask is whether there is an earned advantage, a genuine business reason and a core business fit to owning enterprise software. Importance alone does not warrant ownership. In case the answer is no, the problem collapses to evaluating existing software vendors on the market.

Time to Value: What is the realistic, expected timeline for each option to deliver meaningful operational value at scale? The cumulative opportunity cost of slow progress over years can be very large but often neglected in decision-making.

Return on Investment: The full cost, not just the initial spend, and expected efficiency gains over time determine how the different paths pay off. Building and evolving quality enterprise software for critical operations requires tens of dedicated FTEs and sustained investment over years in at least engineering, QA, product, infrastructure and support capabilities. Tinkering will not deliver results at scale and not sustaining investment over time risks rapid degradation. From a value delivery standpoint first releases are seldom stable or provide the same operational value as the best solutions on the market. The best solutions on the market benefit from having evolved over multiple development cycles drawing on the real-world experiences and feedback from a wider customer base.

Talent & Focus: Does the company have and can it commit, or can it hire, onboard and retain, the needed specialised talent in the required volumes? Are vast resources best utilised for building this capability versus other development initiatives? Committing teams of the best engineers and other resources to a complex, multi-year roadmap means they are unavailable for anything else.

Risks: Different paths carry different risks. In-house development carries talent, execution and technology risks, whereas opting for existing software carries vendor risk.

Before embarking on a long and risky in-house development journey, a good sense check is to consider the company’s past track record with equally complex software builds. Evidence found in industry research on the success of IT projects is crushing.  According to McKinsey and the University of Oxford, large IT projects on average run 45% over budget and 7% over time, while delivering 56% less value than predicted. Software projects fare worst on cost and schedule, running on average 66% over budget and 33% late.1 

In buying software, choosing the right vendor with proven capabilities requires careful consideration, and it is important to confirm data portability and have an exit path available. However, in comparison to in-house development, proven solutions carry significantly lower delivery and value capture risks.

Weighing the above points to a clear picture: the slow time to value, high costs, lower expected value delivery and significant risks associated with in-house software development make sense only in case enterprise software is seen as a core business worth continuously investing significant resources in.

The viability of programming existing systems to deliver needed capabilities depends on the system and ambition level, but flexibility is always limited. Operational value can fall short of expectations and will fall clearly short of industry-best solutions due to limitations imposed by system architecture, leading to blockers and compromises in what can be achieved. Developing something on top of existing information systems is not a light or risk-free undertaking. Teams are essentially building band-aid solutions to compensate for the shortcomings of existing system providers without control. Delivering operational value can still take years, and limitations in what can be achieved creates a ceiling that severely limits value.

Adopting best-in-class, proven software solutions provides clearly the fastest time to value (in months vs. years) and easily the greatest operational value with often fully transparent subscription-based pricing. The best vendors possess a deep understanding of maintenance processes, systems and data. They also have a strong delivery approach that guides customers through configuration to their own operational needs and provides strong change support, so users get what they need and learn to trust the solution. Loss of control is partially mitigated by challenges being often shared across operators. Responsive vendors listen to customers’ unmet needs, and larger gaps in solution capabilities are already likely on the development roadmap. The best ways to mitigate vendor-specific risks are strong vetting and contracting.

In summary:

Build in-house

Pros (+)

  • Full customisation. The solution can be built around the airline’s own business context and requirements, as far as internal resources allow
  • New in-house IT capabilities. The team and know-how built during the project can be used in future projects

Cons (−)

  • Slow time to value. Realistic go-live only in year 3–4. The delay can mean tens of millions of euros in benefits left on the table
  • High and uncertain cost. Up to €4–7M a year and 30–40 FTEs at peak2, plus 5–10 FTEs even after go-live for development, maintenance and 24/7 support. Development costs are just the tip of the iceberg
  • High delivery risk. Integrations to legacy M&E systems without proper interfaces, hard optimisation problems and mission-critical processes. On average, large IT projects run 45% over budget and deliver 56% less value than planned, and software projects run 33% late1
  • Talent and focus. Needs scarce specialists (software engineers with aviation maintenance expertise, optimisation experts etc.), with up to a 6 months’ hiring lead time for in-demand roles such as AI and advanced analytics. Other major IT projects would have to be deprioritised
  • Value erosion. Compromises during development and adoption mean fewer capabilities are delivered, so the full business case may never be reached
Buy a proven SaaS solution

Pros (+)

  • Fast time to value. At QOCO Systems, for example, an airline goes live in 4–6 months, with a solution already refined and proven at other airlines.
  • Proven results. The best vendors have a track-record of proven results wi1th other customers
  • Predictable cost. Costs are visible at the time of decision. Past and future development costs are shared across many customers
  • Low internal effort. Only configuration is needed, and the vendor leads delivery and change management
  • Continuous improvement. New modules and features keep increasing solution value over time

Cons (−)

  • Vendor owns the roadmap. Final decisions on product development stay with the vendor
  • Vendor choice is critical. Value depends on picking a vendor with proven capabilities and strong references from solving the same problem
  • Vendor margin. The provider takes a margin on top of development costs, though these are shared across the customer base

Extend M&E capabilities

Pros (+)

  • Available immediately. Many M&E systems already offer modules, though with significantly limited configurability capabilities
  • Builds on the existing system. Custom extensions can be added on top of the M&E system to fit the airline’s business context, though viability depends on the system

Cons (−)

  • Limited benefits. Modules have limited optimisation and automation and rely on manual processes. Potential is likely a low single-digit improvement in group labour cost, less than half of what the best SaaS solutions deliver (>10% improvement)
  • Slow to deliver. Realistic timeline for first go-live is 2+ years
  • High cost. Extensions and extra modules add to M&E operating costs, and cumulative investment can be multiple times higher than off-the-shelf SaaS solutions
  • Shares many of the same risks as building in-house: integrations, scope creep, budget overruns, talent needs and value erosion

Conclusion

For most airlines, the choice comes down to one question: is maintenance planning software part of their core business? If not, building anything in-house is hard to justify. Extending the M&E system looks like a middle ground but rarely is, because it means a long project for a fraction of the operational value due inherent limitations.

Adopting a proven solution provides the fastest time to value, the greatest operational value and transparent pricing, with lower delivery and technology risk. Strong vendor vetting and contracting mitigate vendor risk, and less control is a trade-off, but unmet needs are often shared and likely on the solution development roadmap. Whichever paths airlines consider, the cost of inaction is the highest.